Barn: conduit is being run!  This morning the builder's son (Trent J.) finished up the shovel work on the conduit trench (I finished the tractor work on this two days ago).  Now the builder (Jim J.) is installing the conduit in the trench, with the pull rope inside of it.  The pull rope in this case is rated for 500 lbs. of pull strength.  The power company will attach it to the wires and pull them through. 

Once all this is installed in the trench, we'll get the power company out here to inspect.  Assuming we pass, that sets our place in the queue for their contract work.  Last I checked, that queue was about three weeks long...