Monday, September 22, 2014

Paving progress...

Paving progress...  The first photo shows the crew “taking elevations” to determine the grade along the driveway.  This is how they make sure the water flows off the pavement the right way (away from buildings!).  The second photo shows the new apron in front of the roll-up door in the new barn.  The last photo shows the driveway near the barn, which is all finished grading and is ready for road base (a layer of gravel) and asphalt.


No comments:

Post a Comment